5.0 Cumulative Projects and Impacts
Table 5-1. Continued
Project
Jurisdiction
Description
Schedule
Pacific Street Bridge Oceanside
The approved project involves widening the opening under the Pacific Street Bridge at Loma Alta Creek all 1999 to
F to
Widening
allow improved movement of water both from the creek and tidal flushing in the lagoon and creek.
Spring 2000
Agua Hedionda
Carlsbad
This lagoon has undergone maintenance dredging since 1955 and in that period, over 5.9 million cy may havea l
Annu
Lagoon
been removed. This dredged material has been placed on adjacent beaches in Carlsbad. In 1998, over 5dr000 ing,
9, edg
Maintenance
cy were dredged from the middle basin, and over 214,000 cy were dredged from the inner basin. In 1999,panmit expires
er
Dredging
estimated 155,000 cy were dredged from the outer basin.
in 2001
Bristol Cove
Carlsbad
Dredging of 20,000 cy of silt from the Bristol Cove boat channel at the intersection of Park Drive and Cover 1998
May
Dredging Project
Drive to restore it to its original -9 MSL elevation. Although this dredged material was not directly placed on
Carlsbad beaches, it was placed in a future borrow pit within the outer basin of the Agua Hedionda lagoon
which displaced sand for placement onto nearby Carlsbad beaches.
Batiquitos Lagoon
Carlsbad
A phased project to restore Batiquitos Lagoon was initiated in 1995, which has resulted in the dredgingLif el.y
o k1 8
Enhancement
million cy of sediment from the lagoon. Dredged material was used as beach nourishment material for annually
Project
Carlsbad, both south of Agua Hedionda Lagoon and north of Batiquitos Lagoon. 1.6 million cy of sand were
placed on Encinas Beach (near proposed South Carlsbad receiver sites) and 200,000 cy were placed adjacent
to the lagoon inlet (proposed Batiquitos receiver site). Continued dredging and placement is planned to
maintain the lagoon, and may need to be conducted annually. Dredging and placement in May 1999 yielded
10,000 cy; half of which were placed on Carlsbad beaches and the other half of which were placed in least
tern nesting areas in the lagoon. The most recent dredging (February 2000) anticipates placement of 50,000
to 70,000 cy at Encinitas/South Ponto Beach.
Carlsbad Boulevard/ Carlsbad
As a by-product of a condominium construction project, 20,000 cy of sand were placed at Ponto Beach J(ulea1996
ny r
Descanso Lot
proposed South Carlsbad receiver sites).
Subdivision
Moonlight Beach
Encinitas
The city sponsors yearly beach replenishment to place approximately 1,000 cy of sediment on Moonlightnnually,
A
Beach. The sand is purchased and trucked to the site. The most recent replenishment with imported sandor to
pri
was placement of 1,327 cy in Spring 1999.
Memorial Day
San Elijo Lagoon
Encinitas
This project dredges the mouth of the San Elijo Lagoon to maintain the opening and places the cobble and minimum,
At a
Mouth Opening
sand material south of the mouth on Cardiff Beach. Dredging occurs on an as-needed basis. An average nually in the
an of
6,000 cy has been placed on the beach annually. The most recent maintenance dredging (May 1999) resultied
pr ng
in the placement of approximately 10,000-15,000 cy of sand. In 1999, the mouth was opened three times.
Page 5-4
Regional Beach Sand Project EIR/EA
99-69\SANDAG EIREA 5 to 10.wpd 7/17/00