4.13 Noise
Residents near the Cardiff site would be notified at least one week prior to the start of the work; visitors
to the campground would be notified as soon as feasible. The period of impact would not exceed three
consecutive days. The noise from dredge and booster pump operations would be the same as for
Alternatives 1 and 2a.
No significant impacts have been identified; accordingly, no mitigation measures are necessary.
4.13.4 No Action Alternative
Under this alternative, there would be no dredge activity, construction at receiver sites or pipeline pumps,
and there would be no noise levels above ambient conditions at any locations. There would be no noise
impacts.
Page 4.13-10