Table 52
Bonum Creek Jetties
Westmoreland County, Virginia
Baltimore District
Construction and Rehabilitation History
Date(
Construction was completed on two stone jetties at an estimated cost
1968
of 1,000using 8,000 tons of stone. The north jetty was 800 ft
long, and the south jetty was 300
mlw, crown width was 4.0 ft with a single capstone,
tion was
Cover stone used was 2.5 tons, and core
and side slopes were
stone ranged from 25 to 500
Design wave height was 9.0 ft.
A condition survey revealed that the jetties had undergone some set-
1981
tlement but were in good condition.
No further repair or maintenance information has been found.
1986
WESTMORELAND
Figure 65.
Bonum Creek, Virginia
105