Table 49 (Concluded)
Construction and Rehabilitation History
Date(
existing jetty. The landward end of the south jetty was sand
1984
(Cont.) ened to prevent material from passing through the jetty and shoaling
into the channel. Three rubble mound breakwaters were constructed
landward of the jetty to prevent expected erosion from occurring as a
result of sand tightening.
No further repair or maintenance information has been found.
1986
N O R T H JETTY REPAIR
OCEAN
JETTY REPAIR
Figure 62. Ocean City Inlet, Maryland
101