Table 50
Colonial Beach Breakwaters
Colonial Beach, Virginia
Baltimore District
Construction and Rehabilitation History
Seven offshore breakwaters were constructed as part of a beach
1982
restoration project for approximately 7,000,using over 9,000 tons
of stone (Figure 63). One 300-ft breakwater and two ZOO-ft break-
waters were placed at Castlewood Beach, and four 200-ft breakwaters
were placed at Central Beach. All were placed parallel to the shore-
line and approximately 1 0 ft offshore, and they were separated by
0
ft
but allowed for set-
150-ft gaps. Crest elevations were
Crown widths were 6.0 ft, and side slopes
tlement to
ft
were
One layer of
cover stone was placed over one
layer of
underlayer resting on a core and 1 ft bedding layer.
Design wave height was 6.0 ft.
The breakwaters are in excellent condition and serving their intended
1985
function.