Table 1
0
Pine Point
Scarboro River, Maine
Construction and Rehabilitation History
Date(
An 800-ft-long rubble-mound jetty was constructed at Pine Point
1962
(Figure 1 1 , location map)
using 25,600 tons of
stone at a cost of
ft
mlw top elevation, a 5-ft top width,
side slopes, and a
ft-thick bedding layer. The cover layer consisted of 2- to 4-ton
each.
stone, and the core and bedding stones were less than 150
Visual inspections revealed the jetty to be in good condition. Some
1963-
erosion of bottom material was noted along the jetty's seaward side
toe.
The jetty does not have a repair history.
1986
Figure
Location map and typical cross sections of
Scarboro River jetty, Scarboro, Maine