Construction and Rehabilitation History
Date(
About 650
of shoreline revetment was placed landward of the south
1971
jetty terminus. The cost for placing 7,350 tons of stone and
cu
of sand fill was ,100.
An inspection indicated the south jetty was in good condition. The
1983
north jetty repair section was in good condition, but the re-
mainder of the jetty was in poor condition.
26