Table 6
Criehaven Harbor Breakwater
Ragged
Construction and Rehabilitation History
Date(
A 300-ft-long rubble-mound breakwater was constructed (Figure 7
)
1935
using 8,700 tons of stone at a cost of ,800. The structure was
built to an elevation of
mlw, a
top width, and slopes of
and
on the harbor and sea sides, respectively (Fig-
ure 7, inset). The mean tide range is 9.1 ft.
The breakwater was repaired using 1,600 tons of stone at a cost of
1938
1960-
Various inspections indicated the breakwater was in fair to good
condition with some slippage of stone noted.
1977
condition survey was made of the breakwater cross sections, and a
1982
A
center-line profile was obtained (no details).
1986
The breakwater has no known repair history after
I ON
SECTION OF BREAKWATER
STONE
Figure 7. Breakwater located at Criehaven
Harbor, Maine
1
8