Table 4
1
Olympia Harbor
Olympia, Washington
Construction and Rehabilitation History
Date( s )
A preliminary investigation for the small-boat basin was requested by
1974
the Port of Olympia.
18
90
The final project report on East Bay Marina was completed.
Construction of the 656-ft-long floating concrete breakwater was
1983
completed in East Bay Marina.
1985
The harbor and cross section of the breakwater are illustrated in
Figure 74. No repairs or rehabilitation are necessary.
159