Table 43
Port Townsend Small-Boat Basin
Port Townsend, Washington
Construction and Rehabilitation History
Date(
Improvements to the small-boat basin were authorized.
1958
The final design recommendations were submitted.
1962
of the rubble-mound breakwater and dredging
Construction of 1,946
1964
of the adjacent basin were completed. The breakwater was constructed
to +18 ft mllw for a 5-ft design wave. An access channel was cut
mllw with a width of 50 ft
through the existing breakwater to -12
at the bottom of the gap and side slopes of
The harbor and cross section of the breakwater are illustrated in
1985
Figure 76. There are no records of needed repairs or rehabilitation.
163