Table 25
Depoe Bay
Depoe Bay, Oregon
Date(
Construction and Rehabilitation History
The project was authorized.
1937
The project was completed, including basin and channel.
1939
Project expansion was authorized.
1945
Expansion was completed, including expanding the basin, constructing
1952
a retaining wall on the easterly side of the basin, deepening the
channel, and constructing a 160-ft breakwater on the north entrance
to the bay. The breakwater was a concrete gravity type with crest
elevation
to +14 ft mllw.
Project expansion was authorized.
1960
Expansion was completed, including widening the entrance channel to
1966
50 ft and constructing a second breakwater on the north entrance to
the basin. The breakwater was a gravity type, constructed of con-
crete. The crest elevation was +16 ft mllw, with an additional
by 2-ft-thick parapet at the westerly end.
The harbor and cross sections of the jetties are illustrated in
1985
Figure 56. No needed repairs or rehabilitation are reported.
122