Construction and Rehabilitation History
The breakwater at the small-boat basin was repaired.
1975
The breakwater at the small-boat basin was repaired twice.
1977
The breakwater at the small-boat basin was extended 700 ft and
1982
bilitated. The design called for an 800-ft extension, but severe
scour ahead of the work caused cost overruns which necessitated
deleting the last
ft of the extension.
The harbor and cross sections of the jetties and breakwater are
1985
illustrated in Figure 54. The south jetty is in good condition, but
the outer 200 ft of the north jetty is in a deteriorated condition
and has severe scour. The breakwater is in good condition.
118