Harbor Breakwater, Sag Harbor, New York
New York District
Construction and Rehabilitation History
1908
A two-section breakwater was constructed of stone to provide harbor
The total length of the breakwater was
3,180 ft. The inshore section extended 1,330 ft north-northwest from
Conklin Point. The offshore and inshore sections overlapped and were
separated by 100 ft. The offshore section extended 1,850 ft
ft mlw, crown width was
northwest. Crest elevations were
5.0 ft, and side slopes were
The cost of construction was
,800.
Surveys indicated the breakwater had settled 0.5 to 1.0 ft for
1962
siderable lengths. The breakwater was considered stable.
Repairs were made using 1,429 tons of stone at a cost of ,150.
1963
No further repair or maintenance information has been found.