Table 9
Mattituck Harbor Jetties
Mattituck, New York
New York District
Construction and Rehabilitation History
Date(
Two parallel jetties were constructed 400
apart at the harbor
1906
entrance. Lengths were 775
and 680 ft (west).
The estimated cost of construction was ,000.
of the east jetty and 485 ft of the west jetty
The landward 680
were repaired and made sand tight at a cost of ,158. Seaward por-
tions of the jetties were in need of repair and sand tightening.
(Figure 13). The jetties were
The west jetty was extended to 930
1938
considered to be in good condition.
Both jetties were repaired u s i n g ,670 tons of stone. The cost of
1975
repairs was 5,000.
No further repair or maintenance information has been found.
1986
26