Appendix B: Bioengineering for Streambank Erosion Control -- Guidelines
Figure 39c. Wattling (fascine) bundle being installed in the
bank zone. Note that wattling should not be covered completely
with soil; leave top 2-3" exposed for sprouting purposes.
(Photo courtesy of Ms. Robin Sotir, Robin Sotir & Associates)
B-63