Appendix B: Bioengineering for Streambank Erosion Control -- Guidelines
Figure 39a. Schematic of wattling bundle with preparation
specifications. (from Leiser, 1983)
Figure 39b. Procedures for installing wattling bundles on slope
in the bank zone. (from Leiser, 1983)
B-62