X.X Section Name
Dredge Discharge Lines
Photo A- Dredge discharge line placement on the beach berm at the South Carlsbad North
receiver site in December of 1995.
Sand Training Dike
Dredge Discharge Line
Containment Area
Photo B- The end of the discharge line is shown in the foreground. Sand is discharged
into a diked-off area to minimize turbidity and control sand deposition.
Source: Modified Nardin, et al, 1981
Figure 2-21
Beach Building Operations
Regional Beach Sand Project EIR/EA
Page 2-43
9969 Beach Replenishment\Figures\Fig 12-21Building Operations
8/23/99