Table 5
Port Chester Breakwater, Port Chester, New York
New York District
Date
Construction and Rehabilitation History
rubble-mound breakwater was completed from
A
Point
to Sunken Rock (Figure 9 . Crest elevation was
)
ft mlw.
The
estimated cost of breakwater construction was ,000.
The breakwater was repaired using 990 tons of stone. The cost of the
1963
repairs was ,500.
No further repair or maintenance information has been found. The
1986
project has been deauthorized.
Figure 9. Port Chester Harbor, New York