Table 3
Plattsburgh Harbor Breakwater
Plattsburgh, New York
Construction and Rehabilitation History
Date(
1,250 ft of breakwater was constructed of timber cribs filled with
1836-
rubblestone and capped with large stone. Slopes were
and the
1875
timber elevation was at low water level.
The breakwater was extended to 1,565
(Figure 7 ) . A total of
1893
,500 was spent on renewal of the old timber superstructure by one
composed of large facing stones with rubblestone core.
A survey indicated the breakwater was in good condition except at the
ends.
Repairs were made to the north end of the breakwater at a cost of
1971
||content||
18,000.
No further repair or maintenance information has been found.
1986
15