Table 1
4
East and West Breakwaters
Agana Small-Boat Harbor, Agana, Guam
Construction and Rehabilitation History
Date
The 200-ft and 525-ft east and west armor stone breakwaters,
1977
respectively, were a portion of the project completed in 1977
(Figure 2 ) The total project cost
was approximately
||content||
,220,550.
The heads and trunks of the breakwaters were designed for 10 and
-
depth-limited breaking waves, respectively. The structures
have no damage or repair history since their completion.
PHILIPPINE SEA
----_---
FILTER CLOTH OR BEDDING
LAVERS UNDERLAYER
REVETTED MOLE SECTION
CORE MATERIAL 750 TO
LE STONES. TRUNK SECTION ONLY
ARMOR STONES
BREAKWATER SECTION
ISLANDS
Figure
Agana Small-Boat Harbor, Agana, Guam
45