Detour Harbor Breakwater
I
Detour' illage, Michigan
V
Date( s )
Construction and Rehabilitation History
Construction of a 1,310-ft-long rubble-mound breakwater (Figure 169)
1982
was completed for a cost of about ,000,000. The crest of the
It was 11 ft wide
breakwater was installed at an el of
ft
and included a concrete walkway. Cover stone ranged from 950 to
and was placed on
side slopes.
1,800
I
1986
The present condition o f the breakwater is considered good.
h
TYPICAL BREAKWATER CROSS SECTION
Figure 169. Detour Harbor, Michigan
266