Table 26
Oceanside Jetties
Oceanside Harbor, California
Construction and Rehabilitation History
1958
Construction of the Del Mar Boat Basin (formerly Camp Pendleton
Harbor) was completed by the US Navy. The north and south jetties
at the basin entrance also were constructed and are maintained by
the Navy.
1961
The construction of a 1,000-ft-long rubble-mound south jetty at the
entrance to Oceanside Harbor (south of Del Mar Boat Basin) was com-
pleted (Figure 33). The jetty had a crest el of +14 ft mllw and a
width of 1 ft. Side slopes were
8
1968
Construction of a 350-ft-long rubble-mound extension to the south
jetty was completed. In addition, the existing jetty was sealed
in an effort to minimize shoaling of the
from sta
to
entrance channel. Grout holes were drilled through the armor stone
and penetrated the core by 1 to 2 ft. Grout then was pumped in the
holes under pressure to seal the structure.
1986
The jetty is in satisfactory condition.
Figure 33. Oceanside Harbor, California
56