the inflowing sediment concentration by providing information about the supply
reach, i.e., the CT record. Note that when field 2 of the GC record is either
blank, a zero or a 1, the program will calculate the design sediment
concentration for the design water discharge; that is, all concentrations will be
calculated from the supply reach parameters. However, if a negative value other
than 1 is coded, it is interpreted as the water discharge to use for calculating the
design sediment concentration, i.e., the water discharge for the approach reach.
(See Appendix C, GC record.) Also note that the channel geometry, (CT record),
channel slope (ES record) and bed sediment gradation (PF record) must be
supplied for the approach channel when concentrations are to be calculated.
Test 8B contains two GC records which will allow SAM.hyd to calculate two
sets of stable channel dimensions with the only difference between the two being
the water discharge. This means of running is not currently available in
SAMwin, but may be accomplished by manually editing the input file. Test 8C
provides the sediment inflow concentration on the GC record, so is complete
without any supply reach information records.
T1 Test 8A
Calculate stable channel geometry
T1 Calculate Design sediment concentration using a reference reach
F#345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678
TR
CT
15
10
2
2
4
1
1
1
1
PF
1
.8
98
.48
50
.25
16
ES.00016
WT
60
GC 2680
-2680 .000162
3
3
1
.7
1
.7
SP 2.65
$$END
TI
TEST NO. 8B CALCULATE GEOMETRY USING COPELAND'S PROCEDURE
F#345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678
CT
15
10
1.65
3.0
4
1
2
1
2
PF
1
.8
98
.48
50
.25
16
ES162E-6
GC 3680
.000162
3
3
2
.7
2
.7
GC 6530
.000162
3
3
0
.05
0
.05
WT
60
$$END
TI
TEST NO. 8C CALCULATE GEOMETRY USING COPELAND'S PROCEDURE
F#345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678
GC 3680
100 .000162
3
3
2
.7
2
.7
PF
1
.8
98
.48
50
.25
16
WT
60
$$END
T1 8D
Stable Channel Design, Gravel Bed river option
T1
Cowan multiplier used for both design and supply reach
F#345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678 2345678
TR
CT
140
15
2
2
4
0
0
PF
16
8
98
4
65
2
45
PFC
1
20
.5
10
ES0.0017
WT
50
GC 2680
-2680 .000162
3
3
1
.7
1
.7
SP 2.65
GB
10
1.15
0.025 1.0000 0.0150
$$END
116
Chapter 6
Input Requirements and Program Output for SAM.hyd