Home
Download PDF
Order CD-ROM
Order in Print
Home
>
Coastal and Hydraulics Laboratory Fact Sheets
>
> Figure 12.3 Channel Stabilization with Rock Sills
SIMPLE BED CONTROL STRUCTURES
Figure 12.4a As Built Riprap Grade Control Structure with Sufficient Launch Stone to Handle Anticipated Scour
7_StreambankManual
Page Navigation
247
248
249
250
251
252
253
254
255
256
257
Grade
Stabilization
(a)
ORIGINAL
BED
STABLE
CHANNEL
SLOPE
(b)
BLOCK
SILLS
STABLE
REACH
(c)
STABLE
CHANNEL
SLOPE
Figure
12.3
Channel
Stabilization
with
Rock
Sills
(adapted
from
Whitaker
and
Jaggi,
1986)
257