Averaqe Cost Per Unit
Chemical storage room
C.
top and ceiling, rolled roofing,
tank platform, insulation, door,
hardware, labor, etc.
(cost for outside dimensions)
sq.
ft.
2.
Concrete block (designate
elements from Section C, IV)
Tank platform (pressure treated lumber)
(designate
B, XV, j)
Plumbing items
Interior (includes pumps,
valves, tanks, sink, strainers,
eyewash, drench shower and
triple rinse device)
2950.00 per job
2.
Exterior (includes supply pipe
75% of actual
and pump necessary to convey
cost with
water to the facility)
receipts
f.
Electrical (all components)
75% of actual
cost with
receipts
Driveway (entrance and exit)
Grading (designate elements
from Section C, II)
2.
(fabric filter cloth)
2.00 sq. yd.
Stone (designate elements
3.
from Section C, VII)
h.
Miscellaneous (fire extinguisher,
75% of actual
cost with
receipts
1997
Page
VII-22