Location in Final EIR
Description
Table ES-7
Under Public Health and Safety for Alternative 1a, revised text to read
"discharge" pipelines rather than "conveyor" pipelines.
Table ES-7
Under Traffic for Alternative 1a, added text to clarify that traffic and parking
could increase after sand placement since beaches would become more
attractive to recreational users.
Table ES-7
Under Air Quality for Alternatives 1a and 2a, expanded description of General
Conformity threshold values.
Section 2.3.2
New section added regarding possible onshore sources of sand and the
reasons for their elimination.
Section 2.3.7
Expanded by adding estimated cost for extending north jetty at Agua
Hedionda Lagoon.
Sections 2.4.1 and 2.7
Finalize permit requirements for North Carlsbad site per historic mean high tide
line determination and changes to be made in final design.
Section 2.4.1; Figure 2-20
Further clarification regarding design features to avoid indirect impacts to
CDFG artificial reefs from vessel transiting. Clarification on beach building
method at cobble receiver sites. Expand description of dredge operation
characteristics. Modify discharge pipe placement near Tijuana Slough National
Wildlife Refuge.
Section 2.5
Expanded text on the discussion of the annual lagoon monitoring program.
Section 2.5.1
Clarify duration/frequency of turbidity monitoring.
Section 2.5.4; Table 2.8
Added new section and table with a summary of all project design features,
monitoring commitments and possible mitigation measures.
Section 2.6
Added text regarding the environmentally superior alternative.
Section 2.7
Expanded text for the coastal permit process.
Tables 2-8, 2-9, 2-10
Added new Table 2-8 so these become 2-9, 2-10 and 2-11 respectively.
Table 2-11 (previously 2-10)
Changed permits required to reflect no permits necessary from City of
Carlsbad.
Figure 2-15
Added four inshore artificial reefs at Oceanside Artificial Reef No. 2. Decrease
dredge area at SO-9 to provide 350' buffer from relocated experimental rock
scatter.
Figure 2-16
Modify discharge line placement to avoid crossing artificial reefs near SO-7.
Section 3.1.1
Defined "critical erosion areas" per the USACOE CCSTWS study.
Sections 3.1, 3.4
Describe previously unknown scattered rock reef experiment at SO-9 as that
had not been relocated following placement, was not mapped by CDFG.
Section 3.2
Text added to discussion of Buena Vista, Agua Hedionda, and Batiquitos
Lagoons regarding tidewater goby and light-footed clapper rail, plus correct
Batiquitos Lagoon description after enhancement project.
Section 3.3
Clarified section and tables in Appendix D where more water quality analysis
could be located and added text to guide reader to locations in the EIR/EA
where methods of water quality and sediment sampling were described.
Section 3.4
Corrected nesting season for western snowy plover. Added text discussing
W-2 plover nesting colony at Batiquitos. Expanded discussion of nesting
behavior of western snowy plover. Expanded discussion on sand depth
measurement techniques.
Sections 3.4, 3.6, 4.4, 4.6
Added location and description of Encinitas City Marine Life Reserve and
evaluated potential impacts.