Table 33 (Concluded)
Date s
Construction and Rehabilitation History
and seaward end of the breakwater were repaired
The landward 485
using
to 5-ton armor stone and resetting existing stone. Landward
repairs were mostly along the seaward side. Repair areas were mostly
small, isolated areas of displaced stone which were rebuilt to the
grade lines of surrounding sections. The total repair cost was
,850.
Visual inspections indicate the breakwater was in good condition.
1978
1984-
Yearly visual inspections of the breakwater indicated it to be in
1986
good condition.