Table 17 (Concluded)
Construction and Rehabilitation History
stone was 53,600 tons which were to be placed for a total contract
1968-
Similarly, the south jetty costs were 1,500
cost of
||content||
,267,500.
1970
(cont.) for placing an estimated 13,500 tons of stone and 7,000 cu yd of sand
and gravel.
Inspections up to this time indicate the jetties were in good
1974
overall. Both jetties had isolated areas of settlement, with
two areas on the north jetty being severe.
Visual inspection of jetties indicated the jetties were in good
1983-
condition.
1987
42