Table 95
Cattaraugus Creek Harbor Breakwaters
Hanover. New York
Construction and Rehabilitation History
Construction of two rubble-mound breakwaters was completed
1983
ure 262). The north breakwater was 600 ft long with a crest el of
ft
and armor stone ranged from 2 to 5 tons. The south
were
breakwater was 1,850 ft long and included armor stone that ranged
from 4 to 9 tons. It included a
ft
crest el, a 13.5-ft
crest width, and
struction was about .1 million, which included a 550-ft-long berm
attached to the north breakwater (Figure 262). The breakwater con-
figuration was model tested prior to construction (Bottin and
1975).
No maintenance repairs have been performed, and the structures are in
1986
good condition. An aerial photo of the Cattaraugus Creek breakwaters
is shown
Figure 264.
262. Cattaraugus Creek Harbor, New York
385