Table 89
,
Lakeshore Park Breakwaters
Lakeshore Park, Ohio
Construction and Rehabilitation History
Date
Construction of three offshore detached breakwaters, 125 ft l o n g
1983
each, was completed (Figure 244) for shoreline protection. The
breakwaters were rubble-mound structures with 9.5-ft-wide crests and
(Figure 2 4 4 ) . Side slopes were
els ranging from
to
ft
on the lakesides and
on the harbor sides.
stone
ranged from 1 . 5 to 3 tons.
The
presently are considered to be in good condition, and
1986
there are no records of maintenance repair. An aerial photo of the
Lakeshore Park breakwaters is shown in Figure 245.
i
I
36 1