Table 82
Lakeview Park Breakwaters
Lorain, Ohio
Construction and Rehabilitation History
Construction of three 250-ft-long offshore breakwaters was completed
1977
at the site (Figure 217). The breakwaters were rubble-mound struc-
ft
crest els and 14-ft-wide crest widths (Fig-
tures with
and armor stone ranged from 4 . 5
to 10 tons (max).
were conducted to determine causes of ero-
Model tests (Bottin
1982
sion of the beach fill. Improvement plans consisted of modifications
to the west end of the west breakwater and the west groin.
There is no record of repairs to the breakwaters, nor have any im-
1986
provements been made. The breakwaters are in good condition. An
the Lakeview Park breakwaters is shown in Figure 218.
aerial view
LAKESIDE
I
MAP
SCALE OF
Figure 217.
Lakeview Park, Ohio
326