Table 76
Bolles Harbor Jetty:
Bolles Harbor, Michigan
Construction and Rehabilitation History
Construction of a 400-ft-long rubble-mound jetty west of the entrance
1970
and a disposal site (Figure 203) was completed. The jetty had a
10-ft crest width and an el of
ft
side slopes of
and armor stone ranging from 700 to 1,600
An
of the site indicated the jetty was in good condition.
1984
There is no record of jetty maintenance.
.
Figure 203.
Bolles Harbor, Michigan
308