Table 70
Caseville Harbor Breakwater
Caseville, Michigan
Construction and Rehabilitation History
Date
1964
Construction of a 1,780-ft-long rubble-mound breakwater (Figure 188)
was completed. The structure had an 8-ft crest width,
side
slopes on the channel side, and
side slopes on the lake-
)
crest el of
ft
and 2-ton
cover stone, while the shore-
ward 780-ft section (Section
included a crest el of
ft
and cover stone that was 1 ton (min).
Repair of the rubble-mound breakwater was performed.
1980
1986
The structure presently is considered to be in good condition. An
aerial view of the Caseville Harbor breakwater is shown in
Figure 189.
.
...