Table 63
Cheboygan Harbor Breakwater
Cheboygan, Michigan
Construction and Rehabilitation History
Construction of
1968
was completed.
The breakwater was constructed with a crest el of
ft lwd and
a crest width of 8 ft. Cover stone was 2 tons
toe stone was 4
tons (min), and side slopes of the structure were
Minor repairs to the existing stone breakwater and construction of a
1982
concrete walkway on the crest of the structure were completed.
The breakwater is presently considered to be in good condition. An
1986
aerial photograph of the Cheboygan Harbor breakwater is shown in
Figure 175.
VICINITY MAP
,
COVER
BOTTOM
T Y P I C A L SECTION O f RUBBLE-MOUND BREAKWATER
Figure 174.
Cheboygan Harbor, Michigan
272