Table 7
Bavfield Harbor Structures
Bayfield Harbor, Wisconsin
Construction and Rehabilitation History
Date
1936
A 465-ft-long pier (Figure 1 7 , Section A) was constructed by the
State of Wisconsin. The pier was a rock-filled timber crib structure
that was 2 4 ft wide and had a crest el of
ft
Section A ) .
A 200-ft-long city pier ell and a 459-ft-long city breakwater pier
1941
(Figure 1 7 , Section B) were constructed by the State of Wisconsin,
The structures had the same cross sections a s the pier built in 1936.
1960
extension of the city pier ell and a 139-ft-long
A
extension of the city breakwater pier were completed by the Corps.
The extensions were of cellular sheet-pile construction. The cell
ft
crest el. They
were sand filled with a grout-filled stone cap. Toe protection was
provided on the lakeward side of the north extension only (Figures 1 7
and 18, Section C. The Corps also built a parapet wall totaling
)
843 ft in length on the existing piers. The crest el of the parapet
was
ft lwd.
1986
The structures presently are in good condition.
39