Table 5 (Concluded)
Construction and Rehabilitation History
Date(
prior t o construction of t h e south j e t t y . This m a t e r i a l was placed t o
1984-
ft m l t . The
ft mlt and at the root of the jetty was placed to
1986
(cont.) maximum ground elevation allowed for jetty construction was mlt, thus
some excavation was required at the landward ends. Prior t o con-
struction, the total amount of stone and costs were estimated at
248,000 tons and ,200,000, respectively.