New Haven Harbor Breakwaters
New Haven, Conn.
Construction and Rehabilitation History
18-
80
Three rubble-mound breakwaters were constructed as part of the Harbor
of Refuge at New Haven (Figure 4 ) The breakwaters were constructed
7.
1915
of +12
a 12-ft crown width, and slopes
to a crown
and
on the harbor and sea sides, respectively. The
of
during 1880-90 using
3,450-ft
east breakwater was
293,800 tons of stone and repaired in 1911 using 2,900 tons of
during 1891-96
breakwater was
stone. The
using 339,000 tons of stone and repaired in 1 1 and 1915 using
91
.
10,600 and 12,000 tons of stone, respectively The 4,200-f
t
during 1896-97 and 1907-11 using
west breakwater was
478,100 tons of stone and repaired in 1915 using 14,300 tons of
stone. The breakwater's construction costs during this period were
||content||
,120,000.
The breakwaters were repaired using 6,720 tons of stone for a
1935
cost of ,500.
1960-
The breakwaters were considered to be in fair to good condition
1974
inspections taken over this period.
during
1984
inspection of breakwaters indicated they were in good
condition.
NNEL
HARBOR
OF
REFUGE
LONG
Breakwaters at New Haven Harbor of Refuge, Conn.