Table 8 7
Geneva-on-the-Lake Structure
Geneva-on-the Lake, Ohio
Construction and Rehabilitation History
Construction of three offshore experimental breakwaters was completed
1978
as part of a shoreline erosion control demonstration program. These
were low-cost shore erosion protection devices which might be feasi-
ble for use by private property owners. Three structure designs
sta-pod, gabion, and z-wall) were constructed for a cost of
The structures are being monitored, and no maintenance
7,200.
will be performed,
Construction of a small-boat harbor is proposed adjacent to the state
1986
park. Two breakwaters totaling about 1 , 4 5 0 ft In length are proposed
for harbor protection (Figure 238). Construction has not been initi-
ated. The project was model tested (Bottin
35 3