Table 6 8
Tawas Bay Harbor Breakwater
Tawas Bay, Michigan
and
Construction of
four
sections
an
length of
ft
completed. The breakwater
an existing timber
of
to form a structure
ft
The
was
filled and capped
precast con-
lwd. The sheetpiling was extended to
crete at a crest
of
of
on the bay
Riprap
from
was
placed on the bay
An inspection of the site indicated the breakwater to be in very good
1985
condition. No maintenance has been performed on the breakwater since
its construction. An aerial photograph of the Tawas Harbor break-
water is shown in Figure 1 8 5 .
283