Table
Bodega Harbor Jetties
Bodega Bay, California
Date(
Construction and Rehabilitation History
1943
The initial construction of the north and south jetties was
pleted at the site (Figure 9 . The north and south jetties were
)
rubble-mound structures with lengths of 1,130 and 1,650 ft, respec-
tively, with crest els of +12 ft mllw and
side slopes.
1961
Rehabilitation of the channels and south jetty was completed for a
cost of 9,800. Stone was added to the seaward side of the jetty
The side slope of the structure over
between sta
and
this 200-ft length was changed to
1985
baffled-concrete pile breakwater was constructed by
A
local interests in the northern portion of Bodega Harbor (Figure
to protect small craft moored there from damages resulting from
wave action. The breakwater was approved for maintenance by the CE
in November.
1986
The structures presently are in satisfactory condition.