2601.
939.
4
6282.
3.33
1.45
1300.
1036.
3388.
1557.
5
7959.
4.22
2.29
2046.
1629.
4175.
2323.
6
9632.
5.10
3.30
2947.
2347.
4962.
3233.
7
0.
0.00
0.00
0.
0.
5749.
4087.
8
0.
0.00
0.00
0.
0.
6536.
5002.
9
14641.
7.76
6.58
5884.
4687.
7323.
5983.
10
16308.
8.64
7.80
6974.
5555.
8110.
7027.
11
0.
0.00
0.00
0.
0.
8897.
8131.
12
0.
0.00
0.00
0.
0.
9684.
9292.
13
21310.
11.29
11.86
10609.
8450.
10471.
10473.
14
22976.
12.17
13.30
11892.
9472.
11258.
11675.
15
0.
0.00
0.00
0.
0.
12045.
12921.
16
0.
0.00
0.00
0.
0.
12832.
14208.
17
0.
0.00
0.00
0.
0.
13619.
15535.
18
29642.
15.70
19.48
17427.
13880.
14406.
16901.
19
31308.
16.59
21.15
18917.
15067.
15193.
18305.
20
16487.
8.73
11.43
10223.
8143.
15980.
19746.
___________ ______ ______ ___________ ___________
188757. 100.00 100.00
89439.
71237.
...END OF JOB...
Printout is in FILE [
C:\Hold\hydtests.yo]
Output Data Description
Since the SAM.yld input file contained a $$JOB record, the use here of the
term "output data set" refers to output from program banner to the "END OF
JOB" tag. As in SAM.hyd and SAM.sed, Table 1 in every output data set is an
echo of the input data set. However, in SAM.yld this table echoes the input from
both the *.yi file and the CDFFIL water data file. Table 2.1 is the "Sediment
Discharge Table" and shows the input sediment discharge rating curve in tons per
day. The next several table numbers and the information displayed differ
depending on whether the calculations were based on a flow duration curve or a
hydrograph. If the input data included flow-duration information, the output
includes tables 2.2 and 2.3. Table 2.2 simply echoes the input flow-duration
curve. Table 2.3, "Integration Parameters for Flow-Duration Option," includes
the number of integration steps, an input item on the Sediment Yield Input
screen, and the integration interval in cfs. If the input data included QH records,
the output includes tables 2.4, 2.5, and 2.6. Table 2.4 echoes the QH records and
lists the time between points. Table 2.5 shows the hydrograph converted to a
flow-duration table. Table 2.6 corresponds the Table 2.3, above, but is the
"Integration Parameters for Hydrograph Option." The number of integration
steps, echoed on this table, is an input parameter.
141
Chapter 8
Input Requirements and Program Output for SAM.yld