Quantcast Table 3.1. Proposed Annual Limitations of Sand Placement Quantities

Custom Search
 
  
 
Table 3.1. Proposed Annual Limitations of Sand Placement Quantities.
MAXIMUM QUANTITIES
MAXIMUM
PERCENT
(CY) PER SEASON
ANNUAL
FINES
PLACEMENT SITE
TOTAL
(1)
ALLOWED
Fall/
Spring/
QUANTITY
Winter
Summer
Goleta Beach
25%
100,000
0
100,000
Ash Avenue
25%
100,000
0
100,000
Oil Piers
35%
183,300
91,700
275,000
Surfer's Point
35%
116,700
58,300
175,000
Oxnard Shores
35%
250,000
0
250,000
Hueneme Beach
35%
250,000
0
250,000
(1) A 25% fines limit is proposed at Goleta Beach and at Ash Avenue because of existing
sensitive resources located near the project sites. At all other sites 35% fines is proposed,
since limited offshore resources exist at these sites and a high percentage of fines exist.
3-9
Moffatt & Nichol Engineers



 